Settling In – Nov. 14. 2014

I was a bit worried about unloading the trailer once it arrived from Connecticut. Dennis Harmon’s workshop had a loading dock, which enabled us to literally roll the machines using pipes and levers onto the trailer (in most cases).

You may recall this picture of loading the Hauser jig borer.

Fitting everything else onto the trailer was a drawn out game of Tetris. Things were packed tight, between and around all the machinery, but not above chest height for safety. I didn’t want any of the machines to get damaged in case things shifted during the long drive from the East to the West.

Moving things into my new shop ended up being rather painless, even though I don’t have a loading dock. I worked with Nelson Trucking, a local rigging company with a great staff. I had the trailer delivered to their dock – some friends and I unloaded it there onto a U-Haul and then the U-Haul was unloaded at the new shop. The machines stayed behind for delivery using a truck with a lift gate. This made moving them incredibly straightforward. With a couple of 4 x 4 ‘s and a pallet jack it all went quite smoothly. The move in of the machines took less than 2 hours from dock to door.

530am arrival!
Putting things in their right place
All in and feeling proud ….and a bit blurry

Now comes a lot of organizing/taking inventory/setting up of the other contents. I’ve been working on just that for the last month. I’m happy to say that the upstairs portion of the workshop is almost there and I’ll be able to start working in a limited capacity soon.

But there’s still a lot more to do…